WWTP Plant in Sweden #1

Cooling Revamp of a Wastewater Treatment Plant

In 2019, MITA Cooling technologies sold 4 PME-E open circuit cooling towers to a Swedish pulp mill. “Super Silent” version of PME allows to respect the extraordinary low sound demands of the customer.

Company and Project

 

Project name

Waste water treatment plant revamp

  

Year

2019

  

Location

Sweden

  

Field of application

Pulp production, waste water cooling

  

National Partner

CAMpreq AB

WWTP Plant in Sweden #4

Customer Needs

    

List of Customer needs

  • Special noise requirements
  • Short project lead time

    

Contact us and tell us your needs
WWTP Plant in Sweden #5

Technology Provided

    

Model

4 x PME 7204 E K19 Super Silent +WA +C

 

Thermal duty

16,5 MW
  

Other specials

  • Single outlet, short side
  • Enlarged access panels and special position of inspection / man hole
  • Basin support frame
  • Special materials C4H
  • Breaker switch in low position
WWTP Plant in Sweden #2

Solution

    

Key to success

  • Site adaption with several solutions
  • Customization visualization
  • Low sound level
  • Low installed power 

    

In short

    
In 2019, we sold n.4 x PME 7204 E K19 Super Silent + WA + C to a Swedish pulp mill.

Super Silent” version of PME allows to respect the extraordinary low sound demands of the customer. “Super Silent” version involves a bigger footprint in comparison with standard version of PME, 16 poles motors and special blades shape.

16 poles motors and special blades allow a relevant decrease of the noise related to the motor-fan group. Water attenuators in basins (WA) and silencers on air inlets (“C”) decrease the noise related to the water falling in the basins.

By oversizing the unit, the required air flow and the pressure loss in the cool pack are decreased thereby allowing use of a smaller motor and at a lower speedl: this bring to another important advantage of the sold solution, that is a considerably lower power use in comparison with the standard model (approx. 50% less).

Contact us and find all MITA solutions
WWTP Plant in Sweden #3